Legrand's real footprint — geography hierarchy, lead brands, and the SAP/ERP data-grain reality (which plants & sites report actuals vs region-level).
Plants on SAP S/4 post transactions at site level; newly-acquired brands & project sites still record at area/region. The view labels each so actuals are never confused with estimates.
Plants on SAP S/4 — every transaction booked at site/line grain. Trust as-is.
Migrating plants & logistics hubs — some postings still land at area level; allocation disaggregates them to site using installed plant lines, headcount and shipment counts.
Newly-acquired brands & project sites — recorded only at region/area on legacy systems. The site figure is a modeled estimate until cutover.
1 · Resolve the site. Match legacy site IDs, brand names and addresses (West Hartford = Legrand North America HQ = Connecticut) into one golden site record — you can't roll up what you can't match.
2 · Tag the grain. Every transaction carries its recording level (site / area / region) and a confidence score, so the view shows actuals vs estimates instead of pretending they're the same.
3 · Disaggregate. For area-level postings, a driver model splits the total to sites by installed plant lines, headcount, shipment counts and payroll — weights learned from on-SAP sites where both grains exist during cutover.
4 · Reconcile & learn. Allocated site sums must tie back to the area total; anomalies and duplicate customer / distributor records get flagged. As each site migrates to SAP, estimates flip to actuals — coverage is now 86% and rising.
Bubble size = revenue; color = operational health. Hover any site for detail and its lead brand.
Manufacturing & logistics geographies across Legrand's footprint.
Lead brand in parentheses where an acquired brand operates the site.
Bar color = data grain: green actuals · amber allocated · red region-only.
The site-level view — including which newly-acquired brands & project sites still report at region level.
| Site | Country | Geography | Lead brand | Revenue | Site-grain | Recording |
|---|---|---|---|---|---|---|
| Limoges, France (Group HQ · wiring devices)HQ | FR | Europe | Legrand (Wiring Devices & Controls) | €1.4 bn | 98% | Actuals |
| West Hartford, CT (Legrand North America HQ) | US | North & Central America | Legrand (Wiring Devices & Controls) | €900 M | 96% | Actuals |
| Somerset, NJ (Raritan — datacenter PDU) | US | North & Central America | Raritan · Server Technology · Starline (Datacenter) · 2015 | €700 M | 94% | Actuals |
| Monterrey & Central America (plants & logistics) | MX | North & Central America | Cablofil (Cable Management) | €700 M | 80% | Allocated |
| France — other plants (Fontaine · Antibes · Sainte-Marie) | FR | Europe | Netatmo · Eliot (Connected) · 2018 | €700 M | 94% | Actuals |
| Varese / Erba, Italy (Bticino — design & systems) | IT | Europe | Bticino (Building Systems) · 1989 | €700 M | 95% | Actuals |
| Canonsburg, PA (Starline — busway) | US | North & Central America | Raritan · Server Technology · Starline (Datacenter) · 2018 | €601 M | 83% | Allocated |
| Cleveland, OH (Avtron / Kratos — datacenter M&A) | US | North & Central America | Avtron · Kratos · ZPE (Datacenter M&A) · 2025 | €600 M | 62% | Region-only |
| Reno, NV (Server Technology — datacenter PDU) | US | North & Central America | Raritan · Server Technology · Starline (Datacenter) · 2015 | €500 M | 92% | Actuals |
| Nashik, India (mega-plant + 6 facilities & 3 R&D) | IN | Asia-Pacific | Legrand (Wiring Devices & Controls) | €500 M | 85% | Allocated |
| Huizhou & Shanghai, China (plants) | CN | Asia-Pacific | Cablofil (Cable Management) | €500 M | 82% | Allocated |
| Vicenza, Italy (Zucchini — busbar / busway) | IT | Europe | Numeric · Zucchini (Power & Busway) · 2010 | €400 M | 86% | Allocated |
| Boulogne-Billancourt, France (Netatmo — connected home) | FR | Europe | Netatmo · Eliot (Connected) · 2018 | €400 M | 82% | Allocated |
| Middle East & Africa (hubs) | AE | Rest of World | Bticino (Building Systems) | €350 M | 60% | Region-only |
| São Paulo, Brazil (Green4T · Cemar — datacenter & energy) | BR | Rest of World | Avtron · Kratos · ZPE (Datacenter M&A) · 2026 | €335 M | 55% | Region-only |
| Australia / SE Asia (CRS · Linkk — datacenter M&A) | AU | Asia-Pacific | Avtron · Kratos · ZPE (Datacenter M&A) · 2025 | €195 M | 58% | Region-only |